Public & Government

Public Facilities Experience

CSN-Main

college of southern nevada – main campus BUILDING

north las vegas, NV
CSN DEPARTMENT OF FACILITIES MANAGEMENT
Project responsibilities included building & fire Code Analysis and ADA/Accessibility Audits under the 2012 IBC & 2010 ADA for this existing approx. 320,000 SF facility of; classrooms, lecture halls, dining commons, library, planetarium, and gymnasium. Project resulted in a mitigation report to outline compliance steps needed to achieve full compliance with current codes & standards. This will allows proposed and future renovations & expansion projects to be done within a compliance baseline. The recommended mitigations are currently in progress, and are projected to be completed by Fall 2014. The project was delivered on time and within the original budget.
LoneMntn

lone mountain park – equestrian shade structure

las vegas, nv
j.w. zunino & Associates
Located in Clark County Nevada, this proposed 35,000 SF outdoor shade structure (intended to cover an earth-surface equestrian court) required automatic sprinklers per local 2012 IBC amendments. PCNA Group prepared an Alternate Methods & Materials request to justify omitting sprinklers for this non-combustible structure. The project can now be delivered on time, and at a substantial savings to the public.
Parkdale

PARKDALE COMMUNITY CENTER

las vegas, nv
CARPENTER SELLERS DELGATTO ARCHITECTS
Project responsibilities included ADA/accessibility compliance review and Alternate Methods & Materials request for the new Community Center Building. The Alternate allowed sprinklers to be omitted for the existing (adjacent) Senior Center building. This project was delivered on time, and at a substantial cost savings to the public.
Purdue

PURDUE MACKEY ARENA RENOVATION

WEST LAFAYETTE, IN
BRENNER DESIGN
Project responsibilities included accessibility code clarification letters to support design criteria for proposed casework kiosks and work-stations. This resulted in greater usability of the public areas, and value-engineered cost savings during the design phase. This project was delivered on time and within the original budget.
BallState

ball state football training complex auditorium

muncie, in
brenner design
Project responsibilities included compliance review of building, fire & life safety, accessibility, and egress design elements for approx. 20,000 SF 2-story addition to the existing building. The new uses include auditorium, film rooms, locker rooms, and coach/staff offices. The project was delivered on time and within the original budget.

CLARK COUNTY DETENTION CENTER – PHASE II RENOVATIONS

Las vegas, nv
DLR GROUP / SLETTEN CONSTRUCTION
Project responsibilities included full code, fire protection and life safety engineering, smoke control system design, preparation of smoke control system drawings, egress design, accessibility analysis for the multi-phased renovation of this existing 12-story high-rise correctional facility project. Specific challenges included coordination a complete renovation of all mechanical/smoke control systems while the facility remained partially occupied. This required us to facility absolute coordination among the entire design team, the City of Las Vegas Building & Fire Departments, and Las Vegas Metro (facility operators). Project was delivered on time and within budget, while being occupied.
CCRJC-Sewer

CLARK COUNTY REGIONAL JUSTICE CENTER –
SANITARY SEWER REPLACEMENTS AND ODOR MITIGATIONS

las vegas, nv
CLARK COUNTY RPM (Department of Real Property Management)
Project responsibilities included forensic investigations of the sanitary vent and drain systems within the facility to identify areas of significant corrosion, damage, and other issues that were contributing to dangerous gas odors within the facility. Solutions included replacements of portions of existing vent pipe stacks, and the addition of building traps to prevent municipal sanitary gas from entering into the building from the service locations. Project was delivered on time and significantly below original budget projections.
CCGOC

CLARK COUNTY GOVERNMENT OPERATIONS CENTER

las vegas, nv
CLARK COUNTY RPM (Department of Real Property Management)
Project responsibilities included plans-check review of building, fire & life safety, accessibility, and egress design elements for this 2-story high-security facility housing all emergency communication and task-force operations in Clark County Nevada. Project was delivered on time and within the prescribed State of Nevada plan-review budget.